anna nery starts production

Petrobras informed last Monday (08), that it started production in the Campos Basin with
the FPSO Anna Nery. The innitative is part of a project to revitalize the Marlim and Voador
fields which will exploit the post-salt and Brava reservoirs. The platform can produce up to
70,000 barrels of oil per day and process 4 million m³ of gas. FPSO Anita Garibaldi is also
part of the Campos Basin revitalization project.

The objective is to increase from 560.000 to 900.000 boeds by 2027. The FPSO Anna
Nery is supplied by Yinson, from Malaysia. It is anchored in a water depth of 927 meters and
connected with 32 wells

Share this content!

Leave a Reply

Your email address will not be published. Required fields are marked *