Atlas, Edison Chouest Group brand new floating dock for its port facility in Brazil, B-Port, is officially on its way to Açu, after leaving Navship shipyard in Navegantes. Last week, Atlas was towed through Itajaí Açu river to Itajaí Port, concluding phase 1 of 3 of the mobilization.
It will now be towed from Itajaí Port all the way to the entrance of Açu Port (phase 2) for later berthing at B-Port (phase 3). The schedule to complete the mobilization is by end of March 2024. With outstanding dimensions, Atlas’ structure can be used for dry dockings and/or repairs services of large OSVs, including every single vessel in Bram Offshore’s fleet.