Guanabara at full capacity

Petrobras has announced that FPSO Guanabara has recently reached its full production capacity. Installed in Mero field, pre-salt of Santos basin, the unit produced 180,000 barrels of oil in one day 8 months after its operation has started. Mero field also counts with FPSO Pioneiro de Libra producing 50,000 bopd. Petrobras is the operator of the consortium with 38,6% interests, balance split between Shell, Total, CNODC, CNOOC and PPSA.

Share this content!

Leave a Reply

Your email address will not be published. Required fields are marked *