BrasFELS shipyard in Angra dos Reis, located around 150 km far from Rio de Janeiro, was hired by Modec to build topside modules for the FPSO of the Raia Project, in Campos Basin. The work should begin in the first quarter of 2024. The agreement provides for the manufacturing of three modules: Vapor recovery/flare knockout unit (VRU/FLARE KO); Oil separation and stabilization;
and flowline circulation and measurement systems.