By Alexandre Vilela
In the last 30 days, we’ve seen an alarming series of mooring line ruptures on Petrobras platforms P-38 and P-19, with 3 incidents on P-38 and 2 on P-19. These events, though unexpected, highlight the critical importance of reliable mooring systems, especially during the rough seas of the winter season. Despite the additional capacity built into these systems, their integrity should not be compromised under such conditions.
At WSB Advisors, we believe that the monitoring of mooring line tension should go beyond computerized models and ROV inspections. We advocate for the use of mechanical means to ensure accurate and real-time tension verification, a technology we are ready to provide to the market.
It’s time to reinforce our approach to offshore safety.