3R Petroleum said that it is ready to resume production at the Papa-terra cluster after a stoppage due to an issue caused by the energy generation system of the Tension Leg Wellhead Platform (TLWP) 3R-2. Before the stoppage, Papa-terra was operated with 4 production wells and an average production of 17,000 barrels per day.